The Challenges
The open plan office areas depict a contemporary working environment with break out spaces being centralised and brightly furnished. LED lighting is a dominant feature in the lift lobby areas while curved walls and bulkheads are continuous throughout the interior space.
The scope of works undertaken involved the supply and installation of automatic voltage regulators, distribution boards, main distribution panel, lightings.
Electrification of 3rd 4th and 5th floor with conducting wiring and fining switch accessories, supply and installation of ICT equipments like Server, cabinet switches, and patch panels
Supply and installation of fire alarm system, PABX system with IP telephones, installation of uninterrupted power system for dedicated computer server, video conferencing system projector and speaker installations.