The Challenges

This  ultra  modern  hotel  has  elegant external  features intended to draw the eye which  includes  stepped levels dividing the building into different  sections suggestive of  functionality. Glazing is conspicuous to the design, permitting natural light into the building; while stainless steel  louvers aid ventilation to the fire escape stairwells  flanking either side.

This  three  star  hotel  has  3 basements ,two  mezzanine  floors  and 140 rooms.

MPSL  has been awarded  the  contract assignments  including the supply and installation of  HT/LV  equipment with HT breaker, transformer automatic voltage regulators, distribution boards, consumer boards, light fitting.

Supply and Installation of fire alarm system, consumer boards distribution boards, security systems  which includes CCTV cameras, intruder alarm system, Public  Address System, Video conferencing, projectors.

Cable distribution via various types of cable trays, trunking, Supply and Installation of Building Management System, Structure cabling of whole building with cat 6A and fiber cable.

Supply and Installation of various types of cabinets for distribution of ICT work with all accessories  and  KNX dimming system for  lighting.

Project Description

Location:Nairobi, Kenya
Year Completed:2014 -2016 (On going)
Value:Kshs. 272 Million