The Challenges
This ultra modern hotel has elegant external features intended to draw the eye which includes stepped levels dividing the building into different sections suggestive of functionality. Glazing is conspicuous to the design, permitting natural light into the building; while stainless steel louvers aid ventilation to the fire escape stairwells flanking either side.
This three star hotel has 3 basements ,two mezzanine floors and 140 rooms.
MPSL has been awarded the contract assignments including the supply and installation of HT/LV equipment with HT breaker, transformer automatic voltage regulators, distribution boards, consumer boards, light fitting.
Supply and Installation of fire alarm system, consumer boards distribution boards, security systems which includes CCTV cameras, intruder alarm system, Public Address System, Video conferencing, projectors.
Cable distribution via various types of cable trays, trunking, Supply and Installation of Building Management System, Structure cabling of whole building with cat 6A and fiber cable.
Supply and Installation of various types of cabinets for distribution of ICT work with all accessories and KNX dimming system for lighting.